Watch the 90-second product tour, then scroll through a full three-page Weekly Stakeholder Report. Every pixel is the same code path that runs in production.

The deliverable

Friday Weekly Stakeholder Update.

Sample data for a fictional medical-center project. Real owners receive this via magic link, can download a PDF on demand, and sign off without ever creating an account.

General Contractor
Halverson & Reed
Builders — Est. 1962
Owner / Client
Northpoint Capital
Real Estate Partners
Weekly Stakeholder Report

Meridian Harbor Tower

Phase II
Week of
April 20April 26, 2026
Owner / Client
Northpoint Capital Partners, LLC
Project Team
GC Internal Team
  • Project ManagerD. Okafor
  • SuperintendentR. Delacroix
  • Asst. Project ManagerM. Sato
  • Project EngineerE. Vasquez
  • Project CoordinatorH. Lindqvist
Owner / Representative
  • Owner's RepJ. Marchetti
  • Development ManagerS. Braun
Architect & Design
  • Architect of RecordKaufmann Hale
  • Structural EngineerThornton Bryce
  • MEP EngineerAtelier Koizumi
Schedule
On Track — Day 143 / 190
Day 143 / 190 — 47 working days to substantial completion.
% Complete
63%
+2 percentage points vs. 61% planned.
Project Address
488 Harbor Point Drive
Portland, OR 97209
Est. Substantial Completion
June 19, 2026
Meridian Harbor TowerWeek of April 20 — April 26, 2026

Weekly Update

This Week
  • 01Completed formwork installation, Level 4 slabGrid A–D
  • 02Stripped & re-shored Level 3 slab; QA inspection passedACI
  • 03MEP rough-in walkthrough with Atelier Koizumi, Levels 2–3Accepted
  • 04North-elevation curtain wall mock-up installed (Unit 2B)Mock-up
  • 05Tower crane quarterly hook & cable inspectionPassed
  • 06Skid arrival: fire pump, jockey pump, emergency generatorB1
  • 07Owner walk — Level 2 hospitality shell & coreThu Apr 24
  • 08Closed 11 RFIs; submitted 4 (envelope, façade, slab edge)RFI Log
  • 09Below-grade waterproofing inspection — south wallClosed
  • 10Zero recordable incidents · 1,420 manhours workedSafety
Next Week
  • 01Level 4 slab concrete pour — 6AM start, full closureWed Apr 29
  • 02Level 5 column formwork & rebar placement beginsFri May 1
  • 03Envelope installation kickoff — east elevation, zones 1–2Façade
  • 04B1 main switchgear set & energization coordinationMEP
  • 05Mechanical rough-in start, Level 4 (upon slab release)MEP
  • 06Design coordination: Level 3 lobby finishes & stoneTue
  • 07Revised 3-week lookahead & resource histogram issuedSchedule
  • 08Sprinkler main riser install — risers 2 & 3FP
Open Constraints
Structural steel delivery — 5-day delay impacting Level 5 start
Mill shipment re-routed via Tacoma; compression of framing sequence under review with erector. Recovery plan submitted Apr 20; awaiting Owner acknowledgment before crew ramp-up.
Active
Since Apr 15
Electrical gear lead time — 2 weeks beyond baseline
Switchgear vendor confirmed revised ship date of May 18. Evaluating temporary service strategy for commissioning window; impact to B1 MEP start being quantified.
Active
Since Apr 09
Curtain wall unit pricing — ASI 014
Architect issued ASI 014 modifying mullion depth at corner conditions. Pricing returned; change order package with Northpoint for approval.
In Review
6 days open
Permit: B1 mechanical room separation rating
Pending AHJ clarification on 2-hour rating at generator pad. Site review scheduled week of May 4.
Pending
Awaiting AHJ
Meridian Harbor TowerWeek of April 20 — April 26, 2026

Field Photography

01 / 06
Level 3 slab — post-pour, looking north
02 / 06
North-elevation curtain wall mock-up (Unit 2B)
03 / 06
B1 generator set staging & fire pump skid
04 / 06
Tower crane hook inspection — quarterly
05 / 06
Core wall rebar placement, Level 4
06 / 06
Owner walk — Level 2 hospitality shell